SMART EPOXY TILE FINISH COMPLETE SET (PRIMER ETP WHITE 02 + 2K PU 22 + FLAKE + ANTI-SLIP POLYMER)
Smart Epoxy Tile Finish
2 Pack System
100% Solid, Solvent Free
With Epoxy Tile Flakes & Anti Slip Polymer
Tested by SIRIM: Pendulum Test (Anti-Slip)
2022CE2975-A1 (Full System + Anti Slip Polymer)
2022CE2976-A1 (Clear + Anti Slip Polymer)
Set Included:
1. Smart Epoxy Tile Primer White Part A+ Part B (1KG)
2. HP Coating 2K Finish PU 22 A + Part B (1L)
3. Epoxy Tile Flakes (1KG)
4. Smart Anti-Slip Polymer (80G)
House Toilet ( Without Shoe ) – Use Anti-Slip 25-40gm
Public Toilet (With Shoe ) – Use Anti-Slip 80gm
Interior Use Only : Coverage 36-40 square feet (25 square feet is the best)
"Please take note : If Tiles are smooth,Please grind before apply below product."
Epoxy Tile Primer Application: Epoxy Tile Primer Part A + Hardener Part B
1. Completion Time: The entire process (mixing, application, and flake spreading) must be completed within 15 minutes
2. Mixing: Combine parts A and B of the epoxy tile primer in a plastic pail & Stir.
– The contrast must be right,Otherwise it will cause Not Dry & Sticky.
3. Application: Apply the primer to the floor. Immediately sprinkle the flakes evenly over the wet primer.
-Minimium 1mm-2mm thickness.(Flake can stick on it)
– After 15 minutes- If cannot finish apply the mixture will begin to dry, producing heat and smoke.
4. Drying: Allow the primer to dry for 4 hours.
5. Cleanup: Sweep away any excess flakes after drying. Use a trowel to press the remaining flakes into the floor and sweep again.
2K PU Finish Application: 2K PU Finish Part A + Hardener Part B + Anti-Slip
1. Completion Time: This process must be completed within 4 hours.
2. Mixing: Thoroughly mix parts A ,B of the 2K PU finish & Anti-slip in a plastic pail & Stir.
-Must use out all Part A + Part B+ together in 1 time,Otherwise it will cause Not Dry & Sticky.
3. Pouring: Pour the mixture back into its original metal container,Close the cover and shake well.
4. Application: Apply on the floor.Advise pour on the floor to apply it.
-Minimium 1mm-2mm thickness.
– After 4 Hour-If cannot finish apply the mixture will begin to dry, producing heat and smoke.
5. Drying: Allow the finish to dry overnight (12-18 hours).
Recommended Tool for preparation :
Plastic Pail (2 unit)
Roller Set (2 Refill)
Stick (2pc)
Brush
Broom Set Masking Tape
Trowel
Sandpaper
Hand Glove
***CAUTION***
Due to Chemical Reaction, Paint will heat up after mixing Part A & Part B
Please finish Primer application within 20 Minutes after mixing (20 Minutes Pot Life)
Please finish pu 22 application within 4 Hours after mixing (4 Hours Pot Life)




























Reviews
There are no reviews yet.